Office of Waste Reduction & Recycling

OWRR Design Guidelines

Site & Space Planning C&D Waste Management Access to Buildings During Construction Requirements by Phase Waste Reduction Home

Printable Version

OWRR C/D Forms
Construction and Demolition Waste Management
Required Information Design Requirements Construction Requirements
Forms and Printed Materials Reports and Presentations Resources and Links

This information supports and supplements information included in the UNC-Chapel Hill Design Guidelines—specifically, Chapter II: Construction Documents Submittal requirements, Chapter III: Construction and Demolition Waste Management and Chapter V: Sections 01606, 01505, and 02070. Contact Sarah Myers (919) 962-4699.

Forms and Printed Materials
Solid Waste Management Plan Inventory & Salvage
Regulated Recyclable Material Ordinance
If the project is outside the University's Development Plan a solid waste management plan may be required by Chapel Hill before the SUP and ZCP will be issued. Contact the Facilities Planning Office for more information on this requirement.

Solid Waste Management Plan Forms

Forms without links have not been completed yet. Contact Sarah Myers for more information.

  Blank Forms: Requirements:

Worksheet and Solid Waste Management Plan (SWMP) Forms:
updated 6/18/07

Excel form
this excel spreadsheet contains multiple tabs
updated 6/18/07

The Draft SWMP is due 5 business days from notice to proceed and before any waste is removed from the job site.

The Final SWMP is due 5 business days from receipt of comments from OWRR review of the DRAFT SWMP and before any waste is removed from the job site.

Monthly Reporting: Excel form
updated 6/18/07

Weight tickets and monthly reports are due with payout materials at the end of each month.

Inventory and Salvage Forms

Blank Forms:

Requirements:
Building materials and equipment

Furniture and fixtures

Who to contact for salvage

Excel form
this excel spreadsheet contains multiple tabs
updated 6/18/07
 


Regulated Recyclable Material Ordinance (RRMO)
Forms and Info


RRMO Summary: Printable PDF (Prepared by Orange County)  
RRMO Flyer: Printable PDF (Prepared by OWRR.)

This handout provides a brief summary of the RRMO for contractors and their employees.
RRMO Hauling Application: License Application PDF
License Application Word Document
Any truck hauling regulated materials in Orange County with a gross vehicle weight of 9,000 pounds or more must have a hauling license.
RRMO Recyclable Material Permit: Recyclable Material Permit Application

Recyclable Material Permit Application Guide
If the project needs an Orange County zoning or building permit, a Recyclable Material Permit is required.
 Facilities Home   |  Energy Services   |  Planning & Construction   |  Campus Services   |  UNC Home   |  Contact Us