This information supports and supplements information included in the
UNC-Chapel Hill Design Guidelinesspecifically,
Chapter II: Construction Documents Submittal requirements,
Chapter III: Construction and Demolition Waste Management and Chapter V:
Sections 01606, 01505, and 02070. Contact
Sarah Myers (919) 962-4699.
Project and university requirements
regarding disposal and removal of equipment and
materials
The information on this page can be found in the
UNC Design Guidelines, Chapter III. University Planning Standards, Section E. Waste Management, a) Required Specifications.
Individual specifications are located in Chapter V. Technical Design and Performance Standards,
A. Division 1 - General Requirements (01060 and 01505) and B. Division 2 - Site Work (02070).