Pre Construction |
|
Outdoor Service Area |
Notify the Office of Waste Reduction and Recycling Contact to remove the following from areas affected by
construction:
- dumpsters and carts
- indoor containers
- walkway bins
This is to happen at the start of each segment of phased construction. |
|
Indoor |
|
Walkway |
Access |
Work with the Office of Waste Reduction and Recycling to ensure that traffic plans
do not impede access to dumpsters or other waste removal services
for occupied buildings. |
Building Material Assessment and Salvage |
Invite the Office of Waste Reduction and Recycling to
Pre-construction meeting.
Review requirements and the list of required and
supplemental recycling with bidders.
Design team, Construction Manager at Risk, Office of Waste
Reduction and Recycling |
Fixtures, Furniture and Equipment Assessment and Salvage |
Department fills out surplus forms and
arranges for moving (move consultant and
contractor).
Shops salvage and report back to design team
and the Office of Waste Reduction and Recycling.
Surplus receives goods
and or provides special pick ups if prearranged.
Departments are moved and
building is left clean and empty of all furnishings, recyclables and
trash.
|
01060 |
Hold separate meeting to review these sections and discuss the draft solid waste management
plan. |
01505 |
02070 |